August 20, 2009
PJ & Zack arrive early to finish plumbing the roof.
Commissioning the system. In this picture:
Grey Box - Steibel-Eltron on demand heater
White Box - Stecca Controller
Note: Both German made!
A blog of many items relating to societal change by a certified Passivhaus design/builder with 25 years experience in low energy and alternative "green" construction. Adam has designed and built earth sheltered, ferro cement, ICF (insulated concrete forms), SIP (structural insulated panels), timberframe, recycled construction incorporating solar thermal, radiant heat & photovoltaic (PV), as well as standard construction.
No comments:
Post a Comment
All comments are welcome!
Please use the Name/URL option (you don't have to register, just enter a screen-name) or sign your anonymous post at the bottom.
ANONYMOUS POSTS WILL BE DELETED.
Thanks,
AJ